Saturday, 18 November 2017

Pentax W-1502 N Setup

Pentax W-1502 N    


Total Station Setup
1 Open Total Station box and pick up Total Station from handle and keep it on tripod and connect  with connecting screw with the tripod base.

2 Now take batteries from box and connect with machine (batteries sort is on right side when you leveling instrument)

3 now click on “Power button” to start machine.

4 Total Station (automatically open my Device) if not select automatically my device select it manually.

5 After this selecting “My Device” Four option will be appear on Total Station Display
1 Fields Genius, 2 Instrument Setup, 3 About, 4 Exits.

Now select first one “1 Fields Genius” and Wait for a 5 seconds.

6 now laser is on level the instrument on the B.M or STN Point and level whole instrument (leveling, centering, and focusing) and keep face on Right “right Face” and select à Continue.

7 After leveling the Instrument Project Manager will come automatically and you can open it manually, But on the new Project at open automatically.
 Now select à “new Project”
Give name -----------   “you can keep name in number or alphabet as you wish” Double click on name area and give name, you can also give name from keypad.
Change to number Two alphabet click on @ on keypad button to change it.
Click à OK  à yes
(Make no change) select à Continue à wait for some seconds.
Now Pentax Fields Genius assistant ask you, would you like to create a new point now?
Click à yes
_____________________________________________________________________________________
Pentax display appear like this
Store point
                   
  Point ID             ____________
                  
   Description       ____________
                  
   Northing           ____________
              
   Easting              ____________
                   
   Elevation           ____________
                 
  Note                   tap to enter note “Advanced”

  Now click à “Store Point” machine ask you ‘The description STN is not fond in the AutoMap library, add to the project file?
Click à yes (if you enter every time new description or code Total Station will ask you like this).

8 Now again “Pentax Fields Genius assistant” ask you, would you like to Setup the Instrument at the new Point?
Click à yes
(For new every new project “Pentax Fields Genius assistant” ask you like this) and assist you on this way.

9 Orientation Setup

Instrument

  è Occupy Point or Station Point                              = _____________

      Instrument Height                                                     = _____________

Bask sight

  è Back sight Point                                                  = _____________

  è Back sight Direction                                          =  _____________

  èBack sight Distance                                       = _____________

  è Target manger                                                      Click to give prism height

Then Click à OK


10 now Rotate Total Station to the Back sight Point and Target it (keep attention here if you make any mistake this will make you more trouble.
Completing this all click à “on Right side down click on Total Station icon to take on back sight and Shot.
            
Displaying
Measuring ………………..
Measuring angle/distance………….
Now check orientation Result:
Accept à if all is correct
Observation Again à if you got Error above 0.020
Cancel à if you don’t want to setup Instrument.

Watch video Tutorial


Thanks…!
Read more


ALL ABOUT CIVIL ENGINEERING SITE WORKS

No comments:

Post a Comment