Total Station
Nikon-BC-80
Setup methods
1) Press on button to start2) Level the T.S with screw button and center it.
3) Select menu button
4) Select Job
Create, Del, FNC, info
MSR1, MSR2, DSP, ANG
NOW
Select MSR1 to Create a Job and give field name that you’re site name then later you remember to expert it.
5) STN = Station
6) Know
7) Resection
8) Quick
9) Remote B.M
10) B.S check
Here you what kind of setup you want to do?For example if you have Co-ordinate then you select
“Know”
If you have co-ordinates and you know where the location of the co-ordinates, but you can’t setup T.S on point then you have to select “Resection”.
Now setups T.S by know.
So select “know”.
Now Input Section
ST = 1 (ST = Station Target point 1, 2, 3 etc.)
H.I = (H.I = Height of instrument measure by tape and put It into their pace)
CD = (CD = code for example tree, stone, wall etc.)
Select enter
Back Sight
11) Co-ordination12) Angle
Select by co-ordination you want or by Angle, I selecting now by co-ordination
Now inter then Co-ordination information
BS : 2 ( the 2 is the point number)
H.T : Height of prism
Enter to save co-ordination information.
Now
Take shot on back sight.
(MSR1 to take shot on prism and then enter to save taken point)
Now you have many point just target it, short it and enter to save you’re taken point.